What is zero-export solar in South Africa?

Zero-export (export limitation) means your inverter is set so little or no PV power flows onto the municipal / Eskom network — you self-consume or throttle instead. It is common while you wait for SSEG approval or a bi-directional meter, and in schemes that cap export. It is a settings and compliance mode, not a different panel. Model savings on self-use against your import tariff; do not assume feed-in credits until export is authorised.

Updated 27 October 2026 · Illustrative ranges — not a formal quote, credit decision or legal advice.

Answer first: Zero-export keeps you lawful and powered while paperwork catches up, but it changes the payback story. Surplus midday PV that cannot be stored or used is curtailed — so battery timing, geyser/pool timers and EV charging windows matter more than nameplate kWp.

When homeowners use zero-export

  • Waiting for municipal SSEG approval or a bi-directional / AMI meter appointment.
  • Metro or estate rules that forbid export on your tariff code.
  • NMD / transformer constraints where the EPC limits export by design.
  • Temporary commissioning before anti-islanding / NRS paperwork is filed.

Related: SSEG registration · bi-directional meters · SSEG cost.

Savings maths under zero-export

Every self-consumed kWh displaces import at your retail / TOU rate. Every curtailed kWh is worth R0 until you have storage or a shifted load. A smaller array with a right-sized battery often beats a large zero-export array that throttles from 11:00–14:00 — export vs self-use · monthly savings.

Settings and proof

Ask the installer to show the export-limit setpoint in the inverter menu or commissioning report, and to leave it documented in the handover pack. When the meter and approval land, changing to a permitted export limit should be a scheduled visit — not a WhatsApp firmware rumour. NRS 097 and metro rules still apply — NRS 097 · approved inverters.

Owner checklist

  1. Is zero-export temporary or permanent on my tariff?
  2. What export limit (kW or %) is programmed today?
  3. Battery / load-shift plan for midday surplus.
  4. Date expected for meter + SSEG so we can revisit settings.
  5. Written confirmation that anti-islanding remains active.

How zero-export shows up on the bill

Import kWh should fall when you self-consume. Export credit lines stay at zero or near-zero by design. Fixed / capacity charges still appear once you are on an SSEG-capable tariff code — zero-export does not mean “same bill shape as before panels.” Compare three bills: pre-solar, zero-export month, and (later) first credited-export month — fixed charges · metro tariffs.

Load shifting that earns its keep

  • Geyser or heat pump timers into the sunny window.
  • Pool pump daytime schedule.
  • EV wallbox solar-priority or scheduled midday charge.
  • Laundry / dishwasher when the app shows surplus.

Without these, a large zero-export array simply throttles. Related: pool pump · geyser · solar EV charging.

Inverter modes and NRS

Export limitation must still respect anti-islanding and the metro’s NRS 097 expectations. “Zero export” via a broken CT or a hacked firmware is how people fail inspections and void cover. Use the OEM’s documented limit mode and keep the commissioning screenshot — NRS 097 · dual-supply labelling.

When to leave zero-export on purpose

If export credits are a few cents while evening import is expensive, a permanent low export cap plus battery self-use can beat “export everything.” Re-run the sheet after your metro publishes the live credit — export vs self-use · payback.

Estate and sectional-title angle

Some schemes insist on zero-export even when the metro would allow feed-in. Get the rule in writing from trustees before you pay for a bi-directional meter you cannot use. Shared plant may need a different SSEG applicant than your unit — sectional title.

Prepaid meters and reverse-power trips

Some prepaid / STS meters dislike even brief reverse power. Zero-export (or a very low limit) is how EPCs keep the token meter stable until a bi-directional product is fitted. If your lights flicker or the meter dumps tokens when clouds pass, tell the installer — CT orientation and limit ramp settings are usual suspects — prepaid + solar · token tips.

Commercial and farm notes

Shops and farms on notified maximum demand can have stricter export rules than houses. A zero-export commercial hybrid still needs a proper SSEG / grid-code path; do not copy a household WhatsApp setting onto a 100 kVA board — commercial SSEG · farm solar · demand charges.

Monitoring so you know you are limited

If the inverter app never shows export and midday production flat-lines while the battery is full and loads are light, you are probably curtailed. That is expected under zero-export — it is also your cue to add a flexible load or more usable storage rather than more panels.

Talking to the metro

Ask which tariff codes allow export, what meter is required, and whether a temporary zero-export commissioning letter is accepted. Get names and reference numbers. Portal folklore changes; the written metro reply wins — municipal SSEG steps.

CT placement mistakes

Export limits need a correctly oriented current transformer on the correct grid conductor. A CT on a downstream sub-board can fool the hybrid into thinking the whole house is exporting when only a wing is. Commissioning should include a controlled test: turn on a big known load, then watch the app’s grid/import/export arrows with the electrician present.

If you DIY-moved a CT to “make the app look nicer,” undo it before the CoC inspection. Related: CoC · earthing.

Battery-full midday playbook

  1. Check whether geyser / pool / EV can absorb surplus in the next hour.
  2. If not, accept curtailment — it is cheaper than illegal export.
  3. Note how many sunny hours you curtail each week; that diary sizes the next battery module.
  4. Do not add panels until curtailment hours shrink.

Pairing with generators

Zero-export hybrids sometimes still accept a generator input during multi-day Stage runs. That mode needs interlocks so the generator cannot back-feed the street while export remains limited. Treat it as a commissioned feature with a test sheet, not a blue-wire weekend project — generator vs hybrid · changeover / ATS.

If your only goal is lights during shedding and the metro export queue is long, a right-sized battery under zero-export usually beats waiting months for credits that may be worth cents.

Checklist before you accept “export soon”

  1. Written metro / Eskom product that pays credits on your tariff code.
  2. Bi-directional or AMI meter actually installed and linked.
  3. Inverter export limit raised only to the authorised kW.
  4. First credited bill filed next to the old zero-export bill.
  5. Payback sheet updated — credits are a bonus, not the base case.

Until those five rows are true, keep designing for self-use. That habit survives every NERSA wording change and every slow meter queue in 2026/27.

When zero-export is the honest design

Constrained feeders, pending SSEG approval, or prepaid migration delays can make zero-export the lawful near-term mode. Self-use still pays against import blocks; just do not claim export cents you are not earning — self-use · SSEG need.

Quick questions

Is zero-export the same as off-grid?

No. The grid can still supply your home; you simply do not push PV out. Off-grid means no grid connection.

Can I earn export credits later?

Only after your metro/Eskom product and meter allow it. Until then, model R0 export.

Will zero-export void my warranty?

Proper OEM export-limit modes are normal. Unofficial firmware hacks are not — stick to documented settings.

Sources

Education only — not a quote, engineering design, credit offer or legal advice. Confirm every figure on the live primary (bank, metro, manufacturer) before you spend money.
Want quotes built around your bill and site? Send installers your real kWh, tariff and roof photos.
Get quotes Check a quote