How long does a home solar installation take in South Africa?

Physical installation is often 1–3 days on site for a standard residential hybrid. End-to-end — site assessment, equipment lead time, install, CoC and SSEG registration — commonly lands around 2–6 weeks, with municipal SSEG turnaround the biggest variable (days in fast metros, weeks in slower councils).

Typical timeline stages

  1. Quote & site survey
  2. Order equipment / pay deposit
  3. Install & commission
  4. CoC issue
  5. SSEG / metering finalisation

What delays projects

Roof structural work, long cable routes, three-phase upgrades, stock shortages, and incomplete SSEG paperwork. Ask for a written programme on the quote.